Rogers Cabin

September 25th, 2008

Here are some photos to show our progress over the last month. Nathan and Chantry have been doing a great job putting the cabin together--with a little help from a young local, Elliott Boyd. The cabin will be "dried-in" by the end of today. We expect to begin mechanical installations next week and will receive our window and door delivery next Thursday.

foggy morning and ready to pour concrete

footings poured, finished, and ready to build on

Wayne Marshall installed foundation

floor framing underway

the first wall is raised and being nailed off

walls up and ready for the roof

roof construction underway

building inspector peeks in at our progress

roof sheathing begins

nearly ready to brave the elements

October 30th, 2008

Winter seems to have arrived a bit early this year. Of course, it may always seem like that in the far reaches of Highland County. All of the mechanical installations have been installed and approved and the insulation was fit and our interior is now ready for sheetrock. On the outside, the soffit trim is complete, the windows and doors are trimmed, and the roofing installed. We will spend the next 2 weeks completing the siding and the remainder of the exterior trim.

starting the window installation

more of the windows and door goes in

Nathan begins the stair construction

Chantry begins air sealing and insulating the wall penetrations

South side view

beginning installation of the porch ceiling

stairs complete

insulation complete

snow on the mountain

December 5th, 2008

Cold, cold, cold...Thank goodness construction includes outside AND inside work. With the heat system up and running, it was a wonderful departure to come inside and start on the trim work. All the flooring is installed and the wall paint complete. We anxiously await the floor finishers arrival next Monday.

Allen the sheetrock "cut man" looks on

Chantry routing grooves in the porch trim

John takes a break from sheetrock finishing

Chantry and Nathan brave the cold

siding gets underway

flooring installation underway

loft flooring complete

staircase construction nearing completion

flooring complete and ready for finishing

gable end siding complete

floor finish between coats

December 17th, 2008

This endearing cabin has had its interior image established now. Jeff and Chantry paired up to tackle the stair and handrail trim work and only after minimal head scratching, have produced a more than adequate route to the 2nd floor. Willard Robinson installed the cabinetry and counter tops yesterday and Todd Mason installed the Mystic River slate as the pad for the cast iron wood stove. The interior trim is nearly complete and Curtie Gutshall will arrive shortly to apply the finish painting.

a view into the bathroom

the kitchen is ready for cabinets

staircase awaits handrail and balusters

loft view

Donny and his helper under way with the kitchen cabinet installation

stove pad

bathroom vanity cabinet

the finishing touches

January 29th, 2009

The extremely cold Winter has frozen most everything, including our web update, until now. The cabin has been completed with respect to the exterior painting which will have to wait for much warmer weather.

back porch view

Chantry and Todd working on the last of the siding


crawl space access

front porch steps

washer/ dryer closet

water closet cubby

kitchen view from living room

kitchen view

Jeremy enjoys a bite to eat during final cleaning

loft view

living room view


exterior view

Nathan and Jeremy finish the last of the exterior trim

April 1st, 2009

Here are some photos from the final punch list days. We sincerely hope that William and Inga can brave the intense Highland County weather from atop this beautiful knoll.





 