June 1st, 2010

All work is complete and the Regnells can now enjoy the finished basement area of their home.

Jeff and his helper cutting the carpet for the bedrooms

Allen and Julian Brinkley put the finishing touches on the paint job

stair carpet installed

view towards the basement entry door

pool anyone?

May 2nd, 2010

The tile floor is complete and we are well on our way to having the trim installed. Andrew has been working to install the wainscot paneling in the living area as Todd completes the bathroom tile work and Julian Brinkley's painters coat the walls.

Allen Brinkley cutting in the walls of the back bedroom

panel trim corner glued up and ready for installation

shower tile underway

Todd finishes up the last of the shower tile

Andrew eases the baseboard trim edge

VIDEO: wainscot panel trim installation

April 12th, 2010

Andrew wore his painter's cap last week and dusted off his sprayer to fit a tight schedule and get the walls primed and ceiling painted prior to the slate tile floor installation. Todd Mason and his helpers just finished setting the last of the floor tiles today and will be back soon to squeeze in the grout.

flooring installation prep

starters

Todd sets the remaining tiles

VIDEO: tile installation nears completion

April 1st, 2010

Warmer days are here. With the sheetrock hanging complete and the sheetrock finishing nearly complete, we look forward to painting and the installation of the slate tile flooring.

Jeremy and Chantry work to complete the sheetrock hanging

Chantry cleans the muck out of the saw table from all the cutting

dirty hands

living room

living room looking out

a brief walk through video

March 4th, 2010

What a nice cozy environment to work in as we near the end of a very long, very cold, and very snowy winter. The first order of business was sawing through the concrete for the addition of another bathroom. After installing insulation in the ceiling, Nathan, Jeremy, and Chantry started with the framing. Soon after, Alleghany Highlands Mechanical installed the duct work and David Lightner, of Lightner's Electric in Monterey, installed the rough-in electrical systems. We began yesterday installing the sheetrock as the plumber finished making all of his connections and will continue with hanging and finishing over the next couple of weeks.

Nathan works to install sheetrock nailers

Chantry shoveling a path to the basement door

tent set up to contain the concrete dust from sawing into the floor

ceiling framing begins

Chantry sawing for Nathan and Jeremy

wall framing begins

framing complete

sheetrock begins
 